NASA Reference Publication, Issue 1189National Aeronautics and Space Administration, Scientific and Technical Information Branch., 1987 - Astronautics |
From inside the book
Results 1-4 of 4
Page 4
... dolly , shown in figure 17 , is located at the end of the track just ahead of the calibration building . It is 72.5 ft long and is used to transport the carriages from the calibration building to the main support building . The same tug ...
... dolly , shown in figure 17 , is located at the end of the track just ahead of the calibration building . It is 72.5 ft long and is used to transport the carriages from the calibration building to the main support building . The same tug ...
Page 13
... Rails & rail supports Rail installation Transfer dolly Track extension Figure 5. Extent of Langley Aircraft Landing Dynamics Facility upgrade . Calibration building Arresting gear Command center building Test surface Air 13.
... Rails & rail supports Rail installation Transfer dolly Track extension Figure 5. Extent of Langley Aircraft Landing Dynamics Facility upgrade . Calibration building Arresting gear Command center building Test surface Air 13.
Page 24
1 / 2 - in . expansion joint Concrete test surface Track rail Track rail Existing base slab Test runway Existing piles Figure 16. Cross - sectional schematic of track . Transfer dolly L - 87-648 Figure 17. Transfer dolly . 24.
1 / 2 - in . expansion joint Concrete test surface Track rail Track rail Existing base slab Test runway Existing piles Figure 16. Cross - sectional schematic of track . Transfer dolly L - 87-648 Figure 17. Transfer dolly . 24.
Page 25
Transfer dolly L - 87-648 Figure 17. Transfer dolly . Arresting gear system Gantry tower Figure 18. Carriage arrestment system. 25.
Transfer dolly L - 87-648 Figure 17. Transfer dolly . Arresting gear system Gantry tower Figure 18. Carriage arrestment system. 25.
Other editions - View all
Common terms and phrases
acceleration accelerometers actual runway surfaces air storage tanks Aircraft Landing Dynamics aircraft landing gear Arresting gear Command arresting gear system Batterson Braking calibration building carriage arrestment system carriage reaction bucket Command center building Data Acquisition System Drag-load beam drop carriage Dynamics Facility ALDF dynamometer energy absorbers ft long ft/sec g units gear Command center high-pressure High-speed shutter valve High-speed test carriage horizontal leg hydraulic inner shutter internal nozzle jet catapult knots L-vessel Landing Dynamics Facility landing gear systems landing gear test Landing Loads Track Langley Aircraft Landing Langley Landing Loads Langley Research Center load transfer Loads Track LLT located Maximum vertical NACA NASA TN nose block onboard Open bay propulsion system shown in figure Space Shuttle Orbiter speed capability Strain gauge tape test section Test surface Test track torque touchdown speeds Trafford J. W. Transfer dolly units on carriage vertical load Vertical-load beam water jet Water Wheel