Uniform Building CodePacific Coast Building Officials Conference, 1943 - Building laws |
From inside the book
Results 1-3 of 48
Page 48
(See Working Stage.) STORY is that portion of a building included between the
upper surface of any floor and the upper surface of the floor next above, except
that the topmost story shall be that portion of a building included between the
upper ...
(See Working Stage.) STORY is that portion of a building included between the
upper surface of any floor and the upper surface of the floor next above, except
that the topmost story shall be that portion of a building included between the
upper ...
Page 114
At the time of laying all units used in plain masonry shall be clean and damp on
the surface. Units laid in mortar shall be laid with full shoved mortar joints and all
head, bed, and wall joints shall be solidly filled with mortar. Masonry units laid in
...
At the time of laying all units used in plain masonry shall be clean and damp on
the surface. Units laid in mortar shall be laid with full shoved mortar joints and all
head, bed, and wall joints shall be solidly filled with mortar. Masonry units laid in
...
Page 273
ter out to grounds and straightened to a true surface and left rough to receive the
finish coat. For three-coat work, the surface shall be scratched to provide a bond
for the brown coat and shall have been in place at least 12 hours before the ...
ter out to grounds and straightened to a true surface and left rough to receive the
finish coat. For three-coat work, the surface shall be scratched to provide a bond
for the brown coat and shall have been in place at least 12 hours before the ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Part IAdministrative | 33 |
Enforcement | 40 |
Part IIIRequirements Based on Occupancy | 51 |
1 other sections not shown
Other editions - View all
Common terms and phrases
Allowable applied approved bars base beams bearing bending bolts Building Inspector carry cement cent Chapter chimneys clay coat Code column compression concrete conform connected construction covering Definition designed diameter direction distance doors Enclosure exceed exit extend exterior walls feet Fire fire-resistive construction floor foot foundation four frame girders grade Group gypsum height horizontal inches iron joints joists lath least length less light load located masonry materials maximum metal occupancy one-half one-hour openings panel partitions permit piles pipe placed plaster plate portion pounds protected reinforced reinforced concrete resist rivets roof Separation shear side slab solid space span Special specified specified in Section stage stair stairways Standard steel story street strength stress Strip structural studs surface Table tests thickness tile tion unit Ventilation vertical walls width wire wood Zone