ProceedingsIEEE, 1997 - Artificial intelligence |
From inside the book
Results 1-3 of 75
Page 15
... production , qualities of the human and products , database containing data of products and production information . In this paper , we have shown the Intelligent & Integrate Production Control System in factory that supports easily ...
... production , qualities of the human and products , database containing data of products and production information . In this paper , we have shown the Intelligent & Integrate Production Control System in factory that supports easily ...
Page 158
... production / purchase to the supply side processes . 4 ) Scheduling Control Function on This function function makes job schedule production or delivery by considering efficiencies when production advice or delivery advice is directed ...
... production / purchase to the supply side processes . 4 ) Scheduling Control Function on This function function makes job schedule production or delivery by considering efficiencies when production advice or delivery advice is directed ...
Page 279
... production objective , assuming that no disruption such as a machine breakdown , default , scrap , etc. will occur The value of the different k , ( i = 2,4,6 ) will depend on the production ratio of the groups i - 1 . in fact , the ...
... production objective , assuming that no disruption such as a machine breakdown , default , scrap , etc. will occur The value of the different k , ( i = 2,4,6 ) will depend on the production ratio of the groups i - 1 . in fact , the ...
Contents
Innovations in Design and Integrated | 1 |
Creative and Innovative Manufacturing | 4 |
Y Fan and C Wu Tsinghua Univ | 7 |
Copyright | |
43 other sections not shown
Other editions - View all
Common terms and phrases
according activities algorithm allows analysis application approach architecture assembly ATRT Automation called communication complete components considered constraints control system cost customers decision defined described determined dispatching distributed dynamic effective Engineering enterprise environment error estimated example exists Figure fixture flexible flow function given implementation important improvement industrial input integration interaction interface INTRODUCTION knowledge lead learning load locating machine manuals manufacturing means measurements method nets object obtained operation optimal output parameters performance Petri planning plant position possible presented problem proposed prototype real-time reference represents requirements robot rules scheduling selected sequence server shown shows simulation solution specific standard station structure task token tool transition unit University virtual