Uniform Building CodeInternational Conference of Building Officials, 1979 - Building laws |
From inside the book
Results 1-3 of 79
Page 24
There is hereby established in this jurisdiction a code enforcement agency which shall be under the administrative and operational control of the building official . Powers and Duties of Building Official Sec . 202. ( a ) General .
There is hereby established in this jurisdiction a code enforcement agency which shall be under the administrative and operational control of the building official . Powers and Duties of Building Official Sec . 202. ( a ) General .
Page 28
International Conference of Building Officials. file an application therefor in writing on a form furnished by the code enforcement agency for that purpose . Every such application shall : 1. Identify and describe the work to be covered ...
International Conference of Building Officials. file an application therefor in writing on a form furnished by the code enforcement agency for that purpose . Every such application shall : 1. Identify and describe the work to be covered ...
Page 31
The building official may authorize the refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or cancelled before any plan reviewing is ...
The building official may authorize the refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or cancelled before any plan reviewing is ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Page | 14 |
Effective Use of the Uniform Building Code | 18 |
Definitions and Abbreviations | 38 |
Copyright | |
65 other sections not shown
Other editions - View all
Common terms and phrases
accordance additional allowable applied approved assembly bars beam bearing bending bolts building official ceiling Chapter column compression compressive stress computed concrete conform connections considered construction continuous covered Decking determined diameter direction distance Division doors edge effective equal equipment exceed EXCEPTION exit exterior face factor feet fire fire-resistive flange floor foot forces Formula frame grade greater Group gypsum height horizontal inches inspection installed joints lateral least length less limited load located masonry materials maximum metal nails Occupancies openings parallel percent permitted placed plaster plate portion pounds protected ratio reinforcement resist roof Section Select separation shear side single slab space span specified square steel story strength stress Structural studs surface Table tension tests thickness tion Type U.B.C. Standard unit values vertical walls welds width wire wood