Uniform Building CodeInternational Conference of Building Officials, 1979 - Building laws |
From inside the book
Results 1-3 of 52
Page 105
... equipment , electrical , transformer , telephone equipment , elevator machine or similar room . 2. In the main return and exhaust air plenum of each air - conditioning system and located in a serviceable area downstream of the last duct ...
... equipment , electrical , transformer , telephone equipment , elevator machine or similar room . 2. In the main return and exhaust air plenum of each air - conditioning system and located in a serviceable area downstream of the last duct ...
Page 144
... equipment and machinery and their anchorage is an integral part of the design and specification of such equipment and machinery . For essential facilities and life safety systems , the design and detailing of equipment which must remain ...
... equipment and machinery and their anchorage is an integral part of the design and specification of such equipment and machinery . For essential facilities and life safety systems , the design and detailing of equipment which must remain ...
Page 549
... equipment . The exhaust capacity shall be 200 cubic feet per minute for each lamp connected to the lamp exhaust system , or as recommended by the equipment manufacturer . Auxiliary air may be introduced into the system through a ...
... equipment . The exhaust capacity shall be 200 cubic feet per minute for each lamp connected to the lamp exhaust system , or as recommended by the equipment manufacturer . Auxiliary air may be introduced into the system through a ...
Contents
CHAPTER | 13 |
Effective Use of the Uniform Building Code | 18 |
Organization and Enforcement | 24 |
Copyright | |
72 other sections not shown
Other editions - View all
Common terms and phrases
allowable stress allowable unit stress applied approved axial bars beam bending bolts building official building or structure ceiling column compression members compressive strength computed concrete conform dead load Decking diameter distance Division 1 Occupancies exceed exit exterior walls fire-resistive construction flange flexural foot Formula frame girders grade Group grout gypsum height horizontal inspection installed joints joists lath least length less live load located lumber materials maximum metal minimum modulus of elasticity mortar nails noncombustible occupant load one-hour fire-resistive openings panel partitions percent permitted plaster plywood portland cement pounds per square prestressing protected ratio reinforcement resist roof rooms Select Structural shear shear stress shear walls sheathing slab space space frame span specified in Section splices square feet square inch stairway steel strength studs surface Table tensile tensile stress tension tests thickness tion Type U.B.C. Standard values vertical welds width wire wood yield strength