California Building Code, Volume 1International Conference of Building Officials, 2001 - Building laws |
From inside the book
Results 1-3 of 84
Page 1-40
... openings need not be enclosed . In buildings housing Group S Occupancies equipped with auto- matic sprinkler systems throughout , enclosures need not be pro- vided for escalators where the top of the escalator opening at each story is ...
... openings need not be enclosed . In buildings housing Group S Occupancies equipped with auto- matic sprinkler systems throughout , enclosures need not be pro- vided for escalators where the top of the escalator opening at each story is ...
Page 1-75
... Openings in Fire Doors . Glazed openings in fire doors shall not be permitted in a fire assembly required to have a three - hour fire - resistive rating . The area of glazed openings in a fire door required to have one- and one - half ...
... Openings in Fire Doors . Glazed openings in fire doors shall not be permitted in a fire assembly required to have a three - hour fire - resistive rating . The area of glazed openings in a fire door required to have one- and one - half ...
Page 12
... Openings through two or more floors for other than stairways or elevators , such as openings provided for piping , ducts , gas vents , dumbwaiters , and rubbish and linen chutes , shall be provided with vertical shaft enclosure ...
... Openings through two or more floors for other than stairways or elevators , such as openings provided for piping , ducts , gas vents , dumbwaiters , and rubbish and linen chutes , shall be provided with vertical shaft enclosure ...
Contents
Matrix Adoption Tables | XTC-1 |
UBC Standard 233 | XTC-23 |
UBC Standard 21 Noncombustible MaterialTests | 1-11 |
Copyright | |
11 other sections not shown
Other editions - View all
Common terms and phrases
2001 CALIFORNIA BUILDING 30 inches A L CL A L accessible route aisle AL CL AL applied approved assembly ASTM braced wall lines building official building or structure CALIFORNIA BUILDING CODE ceiling cement Chapter 11A CL AL CL CL CL comply with Section concrete corridors curb ramps Division door DOSH DSA/AC dwelling units elevator enclosure equipment exceed EXCEPTION exit exterior walls facilities fire-resistive rating fixture floor area gage gypsum handrails height installed joists LA LC LA lath LC LA LC LC LC less located masonry materials maximum means of egress minimum nails noncombustible occupant load openings OSHPD panels percent permitted plaster protected ramp regulations reinforcement requirements of Section roof rooms seating Select Structural side slope smoke square feet stairways storage studs surface Table thickness tion toilet Type UBC Standard Uniform Building Code veneer water closet wheelchair wire wood