Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 1; Volume 7, Part 1American Society of Mechanical Engineers, 1988 - Arctic regions |
From inside the book
Results 1-3 of 86
Page 1
... installation which includes marine spread and special equipment requirements , inclusive of Base Port preparations and operations through to platform attachment to the mooring system . INTRODUCTION When Placid Oil Company selected the ...
... installation which includes marine spread and special equipment requirements , inclusive of Base Port preparations and operations through to platform attachment to the mooring system . INTRODUCTION When Placid Oil Company selected the ...
Page 5
... installation of the mooring legs . One leg was deployed at a time with the primary installation vessel returning to the Base Port to load - out mooring components for each subsequent installation . One vessel , the Damon Chouest ...
... installation of the mooring legs . One leg was deployed at a time with the primary installation vessel returning to the Base Port to load - out mooring components for each subsequent installation . One vessel , the Damon Chouest ...
Page 178
... installation , except in cases where the jackup vessel is not operational for deeper water depths . - Divers are not required for installation . - The CTP can be installed over an existing well conductor . - The CTP uses only a minimal ...
... installation , except in cases where the jackup vessel is not operational for deeper water depths . - Divers are not required for installation . - The CTP can be installed over an existing well conductor . - The CTP uses only a minimal ...
Contents
FLOATING PRODUCTION SYSTEMS | 1 |
OFFSHORE MECHANICS | 23 |
Early Production Systems in the North | 31 |
Copyright | |
37 other sections not shown
Other editions - View all
Common terms and phrases
analysis angle applied axial bending cable calculated characteristics coefficient components Conference connected considered construction cost curve damage depth determined diameter direction displacement distribution dynamic effect element energy Engineering equation equipment fatigue field Figure flexible flow forces frequency function geometry given important included increase installation International joint length limit linear load lower mass material matrix maximum mean measured Mechanics method mode mooring motion natural normal obtained Offshore operation parameters performance period pile pipe pipeline platform position presented pressure problem production range ratio response riser shear shown shows significant soil static stiffness strength stress structure surface Table Technology tension tower turbine vane vessel wave weight wire