Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 1; Volume 7, Part 1American Society of Mechanical Engineers, 1988 - Arctic regions |
From inside the book
Results 1-3 of 86
Page 1
THE DESIGN , PROCUREMENT AND INSTALLATION OF PLACID OIL COMPANY'S GREEN CANYON FLOATING PRODUCTION PLATFORM MOORING ... intended that the mooring system components would be installed and the F.P.P. attached during October of 1986.
THE DESIGN , PROCUREMENT AND INSTALLATION OF PLACID OIL COMPANY'S GREEN CANYON FLOATING PRODUCTION PLATFORM MOORING ... intended that the mooring system components would be installed and the F.P.P. attached during October of 1986.
Page 5
INSTALLATION OPERATIONS A Base Port was established at Fourchon in Louisiana for the storage , preparation and load - out to site of all the mooring components . Attachment of the F.P.P. to the pre - installed mooring system was ...
INSTALLATION OPERATIONS A Base Port was established at Fourchon in Louisiana for the storage , preparation and load - out to site of all the mooring components . Attachment of the F.P.P. to the pre - installed mooring system was ...
Page 178
Marginal field suitability - Simple fabrication with no machined mating surfaces Minimal number of nodes Economic Installation Economic transportation . Several CTP structures can be transported in one barge with the possibility ...
Marginal field suitability - Simple fabrication with no machined mating surfaces Minimal number of nodes Economic Installation Economic transportation . Several CTP structures can be transported in one barge with the possibility ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
FLOATING PRODUCTION SYSTEMS | 1 |
OFFSHORE MECHANICS | 23 |
Early Production Systems in the North | 31 |
Copyright | |
34 other sections not shown
Other editions - View all
Common terms and phrases
analysis angle applied axial bending cable calculated characteristics coefficient components Conference connected considered construction cost curve damage depth determined diameter direction displacement distribution dynamic effect element energy Engineering equation equipment fatigue field Figure flexible flow forces frequency function geometry given important included increase installation International joint length limit linear load lower mass material matrix maximum mean measured Mechanics method mode mooring motion natural normal obtained Offshore operation parameters performance period pile pipe pipeline platform position presented pressure problem production range ratio response riser shear shown shows significant soil static stiffness strength stress structure surface Table Technology tension tower turbine unit vane vessel wave weight wire