THE DESIGN , PROCUREMENT AND INSTALLATION OF PLACID OIL COMPANY'S GREEN CANYON FLOATING PRODUCTION PLATFORM MOORING SYSTEM S. Hanna Placid Oil Company P. G. S. Dove and G. B. H. Breese Omega Marine Services International , Inc. Houston ...
THE DESIGN , PROCUREMENT AND INSTALLATION OF PLACID OIL COMPANY'S GREEN CANYON FLOATING PRODUCTION PLATFORM MOORING SYSTEM S. Hanna Placid Oil Company P. G. S. Dove and G. B. H. Breese Omega Marine Services International , Inc. Houston ...
Page 2
were The following design parameters established for the mooring system : ANALYSIS AND MODEL TESTING o Survival ... off analyses were performed for mooring systems of differing line characteristics to establish an optimum system for the ...
were The following design parameters established for the mooring system : ANALYSIS AND MODEL TESTING o Survival ... off analyses were performed for mooring systems of differing line characteristics to establish an optimum system for the ...
Page 51
The semisubmersible was suspended in the 12 catenary mooring lines . For each heading angle the mooring system was changed according to the new position of the vessel . 8 simple thruster units able to rotate to three heading angles were ...
The semisubmersible was suspended in the 12 catenary mooring lines . For each heading angle the mooring system was changed according to the new position of the vessel . 8 simple thruster units able to rotate to three heading angles were ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
FLOATING PRODUCTION SYSTEMS | 1 |
OFFSHORE MECHANICS | 23 |
Early Production Systems in the North | 31 |
Copyright | |
34 other sections not shown
Other editions - View all
Common terms and phrases
analysis angle applied axial bending cable calculated characteristics coefficient components Conference connected considered construction cost curve damage depth determined diameter direction displacement distribution dynamic effect element energy Engineering equation equipment fatigue field Figure flexible flow forces frequency function geometry given important included increase installation International joint length limit linear load lower mass material matrix maximum mean measured Mechanics method mode mooring motion natural normal obtained Offshore operation parameters performance period pile pipe pipeline platform position presented pressure problem production range ratio response riser shear shown shows significant soil static stiffness strength stress structure surface Table Technology tension tower turbine unit vane vessel wave weight wire