Uniform Building Code |
From inside the book
Results 1-3 of 71
Page 23
... Building Code , " may be cited as such , and will be referred to herein as " this Code . " Purpose Sec . 102. The ... building or structure within the city , except work located primarily in a public way , public utili- ty towers and ...
... Building Code , " may be cited as such , and will be referred to herein as " this Code . " Purpose Sec . 102. The ... building or structure within the city , except work located primarily in a public way , public utili- ty towers and ...
Page 24
... building or structure within any 12 - month period without making the entire building or structure comply . The new construction shall conform to the requirements of this Code for a new building of like area , height , and oc- cupancy .
... building or structure within any 12 - month period without making the entire building or structure comply . The new construction shall conform to the requirements of this Code for a new building of like area , height , and oc- cupancy .
Page 25
... building or structure will be less hazardous , based on life and fire risk , than the existing building . Moved Buildings Sec . 105. Buildings or structures moved into or within the jurisdiction shall comply with the provisions of this ...
... building or structure will be less hazardous , based on life and fire risk , than the existing building . Moved Buildings Sec . 105. Buildings or structures moved into or within the jurisdiction shall comply with the provisions of this ...
Contents
Effective Use of the Uniform Building Code | 20 |
Organization and Enforcement | 26 |
Part IIDefinitions and Abbreviations | 38 |
Copyright | |
92 other sections not shown
Other editions - View all
Common terms and phrases
allowable stress ALLOWABLE UNIT STRESSES applied approved bars beam bending bolts Building Official building or structure ceiling Code column compression compression members concrete conform dead load diameter diaphragms Division 1 Occupancies enclosure exceed exit exterior walls EXTREME FIBER Fire Zone flange flexural floor area frame gauge girders grade Group grout gypsum height installed joints joists lath length less live load located lumber masonry materials maximum metal minimum MODULUS OF ELASTICITY mortar nails noncombustible occupant load one-hour fire-resistive openings panel partitions percent permitted plaster plastic plywood portland cement pounds per square prestressing protected reinforcement resist roof rooms Select Structural shear stress shear walls sheathing slab space space frame span specified in Chapter specified in Section square feet square inch stairway steel strength studs surface Table tension tests thickness tion U.B.C. Standard values ventilation vertical water closet welds width wire wood yield strength