International Residential Code for One- and Two-family DwellingsThe 2003 International Residential Code brings uniformity to construction of one- and two-family dwellings and townhouses up to three stories high. A comprehensive code for homebuilding, this book brings together all building, plumbing, mechanical, and electrical provisions for one- and two-family residences. It establishes minimum regulations using prescriptive provisions, and is founded on broad-based principles that make possible the use of new materials and building designs. This 2003 edition is fully compatible with all the International Codes published by the International Code Council (ICC). |
From inside the book
Results 1-3 of 94
Page 302
... FLOOR FURNACES M1408.1 General . Vented floor furnaces shall conform to UL 729 and be installed in accordance with their listing , the manu- facturer's installation instructions and the requirements of this code . M1408.2 Clearances ...
... FLOOR FURNACES M1408.1 General . Vented floor furnaces shall conform to UL 729 and be installed in accordance with their listing , the manu- facturer's installation instructions and the requirements of this code . M1408.2 Clearances ...
Page 384
... Floor construction . Floor furnaces shall not be installed in concrete floor construction built on grade . 5. Thermostat . The controlling thermostat for a floor fur- nace shall be located within the same room or space as the floor ...
... Floor construction . Floor furnaces shall not be installed in concrete floor construction built on grade . 5. Thermostat . The controlling thermostat for a floor fur- nace shall be located within the same room or space as the floor ...
Page 544
... FLOOR APPLIANCE AVAILABLE TOTAL HEIGHT FOR THIRD FLOOR APPLIANCE AND COMBINED INPUT OF THREE APPLIANCES ( IF TOP FLOOR APPLIANCE IS NOT CONNECTED , MEASURED TOTAL HEIGHT TO VENT TOP ) APPENDIX C ( IFGS ) EXIT TERMINALS OF MECHANICAL ...
... FLOOR APPLIANCE AVAILABLE TOTAL HEIGHT FOR THIRD FLOOR APPLIANCE AND COMBINED INPUT OF THREE APPLIANCES ( IF TOP FLOOR APPLIANCE IS NOT CONNECTED , MEASURED TOTAL HEIGHT TO VENT TOP ) APPENDIX C ( IFGS ) EXIT TERMINALS OF MECHANICAL ...
Contents
AE502 Foundation Systems | 61 |
Part IIIBuilding Planning and Construction 21 | 86 |
E3703 Underground Installation Requirements | 468 |
Copyright | |
3 other sections not shown
Other editions - View all
Common terms and phrases
12 inches accor accordance with Section accordance with Table ampacity appliance applied approved ASTM bonding jumper braced wall line ceiling joists clearance clothes dryer combustion air comply concrete conductors connected construction dead load Design Required diameter draft hood ducts equipment exceed FAN NAT FAN fastened feet fireplace fixture floor flue foundation walls furnace grade Ground snow load grounding conductor grout heaters heating height horizontal ICF wall installed in accordance insulating concrete form insulation joints kN/m² less LINTEL listed and labeled load-bearing located manufacturer's installation instructions masonry heater maximum metal minimum nail NAT FAN NAT opening outlet permitted piping material plate pound per square pressure R-value rafter spans reinforcement roof screws Seismic Design Category sheathing slope snow load psf Southern pine space square foot studs thickness tion Type underlayment units valve vent connector venting system vertical wall studs Wood shingles wood structural panel yield strength