Page 3-158
... Figure 4-4.3.4.2.2 . ) Exception : When obstruction is greater than 24 in . ( 610 mm ) wide , one or more lines of sprinklers shall be installed below the obstruction . ( c ) The obstruction shall not extend more than 12 in . ( 305 mm ) ...
... Figure 4-4.3.4.2.2 . ) Exception : When obstruction is greater than 24 in . ( 610 mm ) wide , one or more lines of sprinklers shall be installed below the obstruction . ( c ) The obstruction shall not extend more than 12 in . ( 305 mm ) ...
Page 3-196
... Figure A - 3-4.1.1 Typical piping layout for combined dry pipe and preaction sprinkler system . To Safe Place Figure A - 3-4.3 Arrangement of air exhaust valves for combined dry pipe and preaction sprinkler system . 50 60 70 Percent By ...
... Figure A - 3-4.1.1 Typical piping layout for combined dry pipe and preaction sprinkler system . To Safe Place Figure A - 3-4.3 Arrangement of air exhaust valves for combined dry pipe and preaction sprinkler system . 50 60 70 Percent By ...
Page 3-204
... Figure A - 4-5.2.3.3 Exception No. 1 Distance from sprinkler to hanger where maximum pressure exceeds 100 psi ( 6.9 ... Figure A - 4-5.2.3.1 Distance between hangers . Baffles A - 4-5.2.3.3 Exception No. 1 See Figure A - 4-5.2.3.3 ...
... Figure A - 4-5.2.3.3 Exception No. 1 Distance from sprinkler to hanger where maximum pressure exceeds 100 psi ( 6.9 ... Figure A - 4-5.2.3.1 Distance between hangers . Baffles A - 4-5.2.3.3 Exception No. 1 See Figure A - 4-5.2.3.3 ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood