Uniform Building Code: 1952, Volume 3International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 66
Page 3-5
... attached beneath the bottom frame member so that it will compress and seal when the curtain is lowered . A separate upper smoke seal , the same as detailed in Section 4.104.2 above , except that the seal shall be approximately 5 inches ...
... attached beneath the bottom frame member so that it will compress and seal when the curtain is lowered . A separate upper smoke seal , the same as detailed in Section 4.104.2 above , except that the seal shall be approximately 5 inches ...
Page 3-124
... attached to a piping system containing water and connected to a water supply so that water dis- charges immediately from sprinklers opened by heat from a fire . Dry Pipe System . A sprinkler system employing auto- matic sprinklers attached ...
... attached to a piping system containing water and connected to a water supply so that water dis- charges immediately from sprinklers opened by heat from a fire . Dry Pipe System . A sprinkler system employing auto- matic sprinklers attached ...
Page 3-234
... attached to hose , always measure the size of the orifice . While hydrant outlets are usually 21⁄2 in . ( 64 mm ) ... Attached To Hydrant To Show Static And Residual Pressures ( A ) Public Main- Gauge Attached To Hydrant Or Pitot Tube To ...
... attached to hose , always measure the size of the orifice . While hydrant outlets are usually 21⁄2 in . ( 64 mm ) ... Attached To Hydrant To Show Static And Residual Pressures ( A ) Public Main- Gauge Attached To Hydrant Or Pitot Tube To ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood