Page 3-147
... Distance View Looking North Obstruction Dimension. 4-3.7.4 Temperature Rating . Sprinkler temperature rat- ings shall be nominal 165 ° F ( 74 ° C ) . Exception : Sprinklers of intermediate and high temperature rat- ings shall be ...
... Distance View Looking North Obstruction Dimension. 4-3.7.4 Temperature Rating . Sprinkler temperature rat- ings shall be nominal 165 ° F ( 74 ° C ) . Exception : Sprinklers of intermediate and high temperature rat- ings shall be ...
Page 3-149
... distance from the centerline of the obstruction to the sprinklers does not exceed one - half the allowable distance between sprinklers . Table 4-4.1.3.1.2 Position of Deflector when Located above Bottom of Obstruction Distance from ...
... distance from the centerline of the obstruction to the sprinklers does not exceed one - half the allowable distance between sprinklers . Table 4-4.1.3.1.2 Position of Deflector when Located above Bottom of Obstruction Distance from ...
Page 3-157
... Distance from Sidewall Sprinkler to Side of Obstruction Less than 4 ft ..... 4 ft to less than 5 ft 5 ft to less ... Distance of Deflector above Bottom of Obstruction ( in . ) 8 ft 6 in . to less than 9 ft For SI Units : 1 in . 25.4 mm ...
... Distance from Sidewall Sprinkler to Side of Obstruction Less than 4 ft ..... 4 ft to less than 5 ft 5 ft to less ... Distance of Deflector above Bottom of Obstruction ( in . ) 8 ft 6 in . to less than 9 ft For SI Units : 1 in . 25.4 mm ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood