Uniform Building Code: 1952, Volume 3International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 51
Page 3-135
... dry pipe sprinkler riser and the quick - opening device . 3-2.4.4 A check valve shall be installed between the quick- opening device and the intermediate chamber of the dry pipe valve . If the quick - opening device requires pressure ...
... dry pipe sprinkler riser and the quick - opening device . 3-2.4.4 A check valve shall be installed between the quick- opening device and the intermediate chamber of the dry pipe valve . If the quick - opening device requires pressure ...
Page 3-137
... dry pipe valves installed in parallel for combined systems , standard trimmings not shown . 3-4.2.2 Each dry pipe valve shall be provided with a listed tripping device actuated by the detection system . Dry pipe valves shall be cross ...
... dry pipe valves installed in parallel for combined systems , standard trimmings not shown . 3-4.2.2 Each dry pipe valve shall be provided with a listed tripping device actuated by the detection system . Dry pipe valves shall be cross ...
Page 3-195
... dry pipe system should be installed only where heat is not adequate to prevent freezing of water in all or sections of the system . Dry pipe systems should be con- verted to wet pipe systems when they become unnecessary because adequate ...
... dry pipe system should be installed only where heat is not adequate to prevent freezing of water in all or sections of the system . Dry pipe systems should be con- verted to wet pipe systems when they become unnecessary because adequate ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood