Page 3-10
... indicated resistance period is one - half hour or over , and determined by the average or maximum temperature rise on the unexposed surface or within the test sample , or by failure un- der load , a correction shall be applied for ...
... indicated resistance period is one - half hour or over , and determined by the average or maximum temperature rise on the unexposed surface or within the test sample , or by failure un- der load , a correction shall be applied for ...
Page 3-41
... indicated average furnace tem- perature for the first three fourths of the indicated period . area under the standard furnace curve for the same part of the indicated period . C = correction in the same units as I. L = indicated fire ...
... indicated average furnace tem- perature for the first three fourths of the indicated period . area under the standard furnace curve for the same part of the indicated period . C = correction in the same units as I. L = indicated fire ...
Page 3-93
... indicated due to reductions in gas temperature associated with the pressure drop and expansion across the regulator . With the draft and gas supply adjusted as indicated in this section , the test flame is to extend downstream to a ...
... indicated due to reductions in gas temperature associated with the pressure drop and expansion across the regulator . With the draft and gas supply adjusted as indicated in this section , the test flame is to extend downstream to a ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood