Uniform Building Code: 1952, Volume 3International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 79
Page 3-45
... Measurement and Acceptance Crite- ria . The thickness of the spray - applied fire - resistive material shall be measured by either of the following methods : 1. A steel rule graduated in at least 1 / 16 - inch ( 1.6 mm ) incre- ments ...
... Measurement and Acceptance Crite- ria . The thickness of the spray - applied fire - resistive material shall be measured by either of the following methods : 1. A steel rule graduated in at least 1 / 16 - inch ( 1.6 mm ) incre- ments ...
Page 3-493
... measurement of total heat release of the fire . Rate of heat release is measured by the principle of oxygen con- sumption . Measurements of the rate of production of carbon mon- oxide and carbon dioxide are normally taken . Where carbon ...
... measurement of total heat release of the fire . Rate of heat release is measured by the principle of oxygen con- sumption . Measurements of the rate of production of carbon mon- oxide and carbon dioxide are normally taken . Where carbon ...
Page 3-510
... measured by Thermocouples 28 , 34 , 35 , 39 , 40 , 31 , 32 , 33 , 36 , 37 and 38 and 2.2.2 Temperatures in the wall cavity insulation shall not exceed 750 ° F ( 399 ° C ) above ambient as measured by Thermocouples 55 , 56 , 57 , 58 , 59 ...
... measured by Thermocouples 28 , 34 , 35 , 39 , 40 , 31 , 32 , 33 , 36 , 37 and 38 and 2.2.2 Temperatures in the wall cavity insulation shall not exceed 750 ° F ( 399 ° C ) above ambient as measured by Thermocouples 55 , 56 , 57 , 58 , 59 ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood