Uniform Building Code: 1952, Volume 3International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 55
Page 3-10
... period judged as ended . Classification as Determined by Test SECTION 7.105 - REPORT OF RESULTS Results shall be reported in accordance with the performance in the tests prescribed in this standard . They shall be expressed in time periods ...
... period judged as ended . Classification as Determined by Test SECTION 7.105 - REPORT OF RESULTS Results shall be reported in accordance with the performance in the tests prescribed in this standard . They shall be expressed in time periods ...
Page 3-21
... period or more than 1/2 times the door thickness as a result of the hose stream test . 2. An assembly consisting of a pair of swinging doors shall not separate more than 3/4 inch ( 19.1 mm ) or a distance equal to the throw of the latch ...
... period or more than 1/2 times the door thickness as a result of the hose stream test . 2. An assembly consisting of a pair of swinging doors shall not separate more than 3/4 inch ( 19.1 mm ) or a distance equal to the throw of the latch ...
Page 3-82
... period of clay masonry walls shall be determined in accordance with this section . The fire - resistance periods of ... period shall be determined in accord- ance with Section 7.720.2 . When continuous air spaces separate multiwythe ...
... period of clay masonry walls shall be determined in accordance with this section . The fire - resistance periods of ... period shall be determined in accord- ance with Section 7.720.2 . When continuous air spaces separate multiwythe ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 3-1 |
System Acceptance 13 65 | 3-13 |
Means of Egress | 3-17 |
Copyright | |
18 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied assembly ASTM authority having jurisdiction beams Brace branch lines brick building official calculated ceiling check valve classification combustible concrete masonry concrete masonry units construction control valve curtain deck determined device diameter dimensions door dry pipe valve edge edition NFPA equipment exceed Exception face feet Figure fire department connection fire test fire-endurance fire-resistance rating Flanges floor flow grade gypsum hangers heat horizontal hose connections hose stations hose stream hydraulically hydrostatic test installed joints joist length less liquid limit listed load located material maximum minimum mortar opening operation panels percent permitted pipe system plasticity index plywood pressure prism protection requirements riser roof Screw SECTION shakes side spaced specified sprinkler system sq ft standpipe system storage surface Table temperature test sample test specimen thermocouples tion tube Type UBC Standard Uniform Building Code veneer vertical water supply weight welding width wire wood