Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 3American Society of Mechanical Engineers, 2002 - Arctic regions |
From inside the book
Results 1-3 of 80
Page 198
... installed based on a qualified procedure . For a number of years the common perception has been that the weakest link in this chain of tasks is the actual bolting installation : " The man with the wrench " . Obviously it is always ...
... installed based on a qualified procedure . For a number of years the common perception has been that the weakest link in this chain of tasks is the actual bolting installation : " The man with the wrench " . Obviously it is always ...
Page 318
... installation , or operation . The ULS aims to ensure that the design is adequate to withstand extreme loads . The ... installation tension T , at the dip - down point ( where the anchor line intersects the seabed and dips down towards ...
... installation , or operation . The ULS aims to ensure that the design is adequate to withstand extreme loads . The ... installation tension T , at the dip - down point ( where the anchor line intersects the seabed and dips down towards ...
Page 387
... INSTALLATION AND RETRIEVAL Lars Hilmersen Aker Marine Contractors AS P.O.Box 247 Lilleaker N - 0216 Oslo , Norway 21st International Conference on Offshore Mechanics and Artic Engineering June. Proceedings of OMAE'02 OMAE2002-28527 ...
... INSTALLATION AND RETRIEVAL Lars Hilmersen Aker Marine Contractors AS P.O.Box 247 Lilleaker N - 0216 Oslo , Norway 21st International Conference on Offshore Mechanics and Artic Engineering June. Proceedings of OMAE'02 OMAE2002-28527 ...
Other editions - View all
Common terms and phrases
alloys analysis applied approximately assessment bending calculated carried coating compared composite compressive considered corrosion crack crack growth curve cycles damage defect deformation depth determined developed direction distribution effect element Engineering equation estimated evaluation experience factor failure fatigue field Figure flaw flexible fracture function geometry given Grade heat higher hydrogen important increase initial installation insulation integrity International joint length limit load locations lower material maximum mean measured mechanical method observed obtained Offshore operation parameters performed pipe plate predicted present pressure problem procedure production properties range reliability residual resistance respectively riser rope safety samples shown shows side simulation solution specimens standard steel strain strength stress structure surface Table temperature tensile tension thermal thickness titanium toughness uncertainties variables weld