Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 3American Society of Mechanical Engineers, 2002 - Arctic regions |
From inside the book
Results 1-3 of 82
Page 198
For a n will then 6 Bolted connections and failures in the offshore industry The
reliability of an installed bolted ... This , as given above , include all engineering
tasks , the bolt fabrication processes as well as the final installation work .
For a n will then 6 Bolted connections and failures in the offshore industry The
reliability of an installed bolted ... This , as given above , include all engineering
tasks , the bolt fabrication processes as well as the final installation work .
Page 318
These effects include damage under transportation , installation , or operation .
The ULS aims to ensure that the design is adequate to withstand extreme loads .
The Accidental damage Limit state ( ALS ) aims to ensure that the design
includes ...
These effects include damage under transportation , installation , or operation .
The ULS aims to ensure that the design is adequate to withstand extreme loads .
The Accidental damage Limit state ( ALS ) aims to ensure that the design
includes ...
Page 387
An important aspect is the effect of handling on the large , but delicate , ropes
during installation offshore using tools and equipment that easily can destroy the
load bearing capacities of the ropes . In order to get hands on experience in the ...
An important aspect is the effect of handling on the large , but delicate , ropes
during installation offshore using tools and equipment that easily can destroy the
load bearing capacities of the ropes . In order to get hands on experience in the ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
analysis anchor applied assessment bending calculated carried coating compared composite compressive considered corrosion crack crack growth curve cycles damage defects deformation depth determined developed direction displacement distribution dynamic effect element Engineering equation estimated evaluation factor failure fatigue field Figure finite element flexible fracture function geometry given Grade heat increase initial installation insulation integrity International joint length limit load locations material maximum mean measured mechanical method mooring observed obtained Offshore operation parameters performed pipe plate predicted present pressure problem procedure production properties range reliability represent residual resistance respectively riser rope safety shown shows side simulation solution specimens stage standard steel strain strength stress structure surface Table temperature tensile tension thermal thickness titanium uncertainties variable weld