Flexible Automation and Integrated Manufacturing 1993Proceedings of the Flexible Automation and Integrated Manufacturing Conference held in Limerick, Ireland, in June 1993 |
Contents
WORLD CLASS MANUFACTURING A PRACTICAL VIEWPOINT | 5 |
CONCURRENT INTERDISCIPLINARY LEARNING | 25 |
MEETING THE CHALLENGE OF CONCURRENT INTERDISCIPLINARY LEARNING | 38 |
AN APPROACH TO GLOBAL COMPETITIVENESS | 55 |
MODELS REQUIRED FOR LOGISTICS NETWORK ENGINEERING INE | 78 |
CIMOSA AND PETRI NETS FOR CIM SYSTEMS MODELLING AND SIMULATION | 103 |
THE NEED TO IMPROVE THE PRODUCTION CONTROL | 356 |
Jannes Slomp | 415 |
MINIMIZING MAKESPANS IN PRODUCTION LINES UNDER LEARNING | 571 |
THE INTEGRATION OF TEST STRATEGY IN THE ASSEMBLY PLANS GENERATION | 591 |
MODELBASED CONTROL OF A DYNAMICALLY RECONFIGURABLE ASSEMBLY SYSTEM | 602 |
THE EFFECT OF MATERIAL HANDLING ON THE PERFORMANCE | 626 |
THE AUTOMATION OF LARGE SCALE ASSEMBLY | 648 |
ELECTRICAL CONNECTIONS AND WIRE HARNESS ASSEMBLY | 668 |
Measurement Inspection and Quality Management | 693 |
SCHEDULING AND WORK FLOW CONTROLLING IN FLEXIBLE FLOW LINES | 879 |
INTEGRATION OF COMPUTERIZED TOOL MANAGEMENT SYSTEM | 447 |
STRATEGIC DECISIONS IN A CONCURRENT ENGINEERING ENVIRONMENT | 462 |
USING ACTIVITY BASED COSTING TO DEFINE A QUANTITATIVE PRODUCT | 485 |
CONCURRENT ENGINEERING IMPLEMENTATION METHODOLOGY | 498 |
REVERSE ENGINEERING CASE STUDIES | 522 |
CONCEPTUAL GRAPH BASED MANUFACTURING SYSTEMS INTEGRATION | 545 |
PPCCAPP INTEGRATION IN A CIM CONTEXT | 903 |
INTEGRATION OF CADCAM AND PRODUCTION CONTROL FOR SHEET | 928 |
FEATURE EXTRACTION AND RECOGNITION FOR SHEET METAL COMPONENTS | 950 |
DYNAMIC FACTORS AFFECTING FORCE MEASUREMENT | 976 |
995 | |
Other editions - View all
Flexible Automation and Integrated Manufacturing 1993 M Ahmad,William G. Sullivan Limited preview - 1993 |
Common terms and phrases
activities activity based cost algorithm analysis application approach architecture assembly plans assembly system automated B-rep cell control CIM-OSA components concept conceptual graph Concurrent Engineering configuration constraints countersink database decision defective defined described due date entity environment equipment evaluation Figure Flexible Manufacturing function fuzzy logic geometric graph IDEF IDEF1X implementation improve industrial industrial robot input inspection interface knowledge ladder logic logistics manufacturing systems material method methodology module neural network nodes object operation optimal organisation output pallet paper parameters Petri Net portainers problem procedure process planning product life cycle production control system prototype representation robot rules scheduling selected sequence simulation solution specific station stereolithography strategy structure surface task techniques University University of Limerick variables Vendor Lot workpiece workstation