Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 3
Page 1-185
... lines and dimensions of the members as required by the design drawings and specifications . 1906.1.2 Forms shall be substantial and sufficiently tight to pre- vent leakage of mortar . 1906.1.3 Forms shall be properly braced ... wall or beam ...
... lines and dimensions of the members as required by the design drawings and specifications . 1906.1.2 Forms shall be substantial and sufficiently tight to pre- vent leakage of mortar . 1906.1.3 Forms shall be properly braced ... wall or beam ...
Page 1-219
... Wall Framing . 2320.11.1 Size , height and spacing . The size , height and spac- ing of studs shall be in accordance ... Braced wall lines shall consist of braced wall panels which meet the requirements for location , type and amount of ...
... Wall Framing . 2320.11.1 Size , height and spacing . The size , height and spac- ing of studs shall be in accordance ... Braced wall lines shall consist of braced wall panels which meet the requirements for location , type and amount of ...
Page 1-223
... BRACED WALL PANELS1 CONSTRUCTION METHOD2,3 SEISMIC ZONE CONDITION 1 0 , 1 and 2A One story , top of two or three ... lines . 2See Section 2320.11.3 for full description . 3See Section 2320.11.4 for alternate braced panel requirement ...
... BRACED WALL PANELS1 CONSTRUCTION METHOD2,3 SEISMIC ZONE CONDITION 1 0 , 1 and 2A One story , top of two or three ... lines . 2See Section 2320.11.3 for full description . 3See Section 2320.11.4 for alternate braced panel requirement ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood