Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 43
Page 1-114
... corridor . ( See Chapter 4 for covered malls . ) 3. In Group I , Division 3 Occupancies such as jails , prisons , reform- atories and similar buildings with open - barred cells forming corridor walls , the corridors and cell doors need ...
... corridor . ( See Chapter 4 for covered malls . ) 3. In Group I , Division 3 Occupancies such as jails , prisons , reform- atories and similar buildings with open - barred cells forming corridor walls , the corridors and cell doors need ...
Page 1-115
... corridor ceiling is an element of not less than a one - hour fire - resistive floor - ceiling or roof - ceiling assembly at the entire story , both sides of corridor walls may terminate at the ceiling membrane . 2. The corridor ceiling ...
... corridor ceiling is an element of not less than a one - hour fire - resistive floor - ceiling or roof - ceiling assembly at the entire story , both sides of corridor walls may terminate at the ceiling membrane . 2. The corridor ceiling ...
Page 1-121
... corridor . 1007.4.3 Corridor doors . Corridor doors shall be protected by a fire assembly having a fire - protection rating of not less than three- fourths - hour , shall not have more than 100 square inches ( 64 516 mm2 ) of wired ...
... corridor . 1007.4.3 Corridor doors . Corridor doors shall be protected by a fire assembly having a fire - protection rating of not less than three- fourths - hour , shall not have more than 100 square inches ( 64 516 mm2 ) of wired ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood