Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 64
Page 1-74
... devices shall be listed for the purpose and shall release or close the door in the event of a power failure at the device . 4. Fire assemblies required by provisions of Chapter 10 shall have closing devices as specified in Chapter 10 ...
... devices shall be listed for the purpose and shall release or close the door in the event of a power failure at the device . 4. Fire assemblies required by provisions of Chapter 10 shall have closing devices as specified in Chapter 10 ...
Page 1-100
... devices , providing all of the fol- lowing conditions are met : 1. Tubing shall be listed by an approved agency for flame and smoke characteristics . 2. Tubing and connected device shall be completely enclosed with- in galvanized or ...
... devices , providing all of the fol- lowing conditions are met : 1. Tubing shall be listed by an approved agency for flame and smoke characteristics . 2. Tubing and connected device shall be completely enclosed with- in galvanized or ...
Page 1-101
... devices ) , such means shall be capable of being overridden by the firefighter's control panel control action and the last control action as indicated by each firefighter's control panel switch position shall prevail . EXCEPTION : Power ...
... devices ) , such means shall be capable of being overridden by the firefighter's control panel control action and the last control action as indicated by each firefighter's control panel switch position shall prevail . EXCEPTION : Power ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood