Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 37
Page 1-195
... GROUT 2103.1 General . Mortar and grout shall comply with the provi- sions of this section . Special mortars , grouts or bonding systems may be used , subject to satisfactory evidence of their capabilities when approved by the building ...
... GROUT 2103.1 General . Mortar and grout shall comply with the provi- sions of this section . Special mortars , grouts or bonding systems may be used , subject to satisfactory evidence of their capabilities when approved by the building ...
Page 1-196
... grout mixing water and aggregate shall be heated to produce grout temperatures between 40 ° F and 120 ° F ( 4.5 ° C and 49 ° C ) . Masonry to be grouted shall be maintained above freezing dur- ing grout placement and for at least 24 ...
... grout mixing water and aggregate shall be heated to produce grout temperatures between 40 ° F and 120 ° F ( 4.5 ° C and 49 ° C ) . Masonry to be grouted shall be maintained above freezing dur- ing grout placement and for at least 24 ...
Page 1-197
... grout pour and grout shall be placed in a continuous pour in grout lifts not exceeding 6 feet ( 1830 mm ) . When approved , grout lifts may be greater than 6 feet ( 1830 mm ) if it can be demonstrated the grout spaces can be properly ...
... grout pour and grout shall be placed in a continuous pour in grout lifts not exceeding 6 feet ( 1830 mm ) . When approved , grout lifts may be greater than 6 feet ( 1830 mm ) if it can be demonstrated the grout spaces can be properly ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood