Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 96
Page 1-21
... materials liquids or solids shall be provided with secondary containment in accord- ance with this section when the capacity of an individual vessel or the aggregate capacity of multiple vessels exceeds the following : Liquids : Solids ...
... materials liquids or solids shall be provided with secondary containment in accord- ance with this section when the capacity of an individual vessel or the aggregate capacity of multiple vessels exceeds the following : Liquids : Solids ...
Page 1-183
... materials shall be those for proposed work . 2. Trial mixtures having proportions and consistencies re- quired for proposed work shall be made using at least three different water - cementitious materials ratios or cementi- tious materials ...
... materials shall be those for proposed work . 2. Trial mixtures having proportions and consistencies re- quired for proposed work shall be made using at least three different water - cementitious materials ratios or cementi- tious materials ...
Page 1-343
... materials shall be installed be- tween the floor and base materials required by Section 1825.2 . EXCEPTION : Where a separate floor is provided above a con- crete slab , the dampproofing may be installed on top of the slab . 1823.2 ...
... materials shall be installed be- tween the floor and base materials required by Section 1825.2 . EXCEPTION : Where a separate floor is provided above a con- crete slab , the dampproofing may be installed on top of the slab . 1823.2 ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood