Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 55
Page 1-24
... piping which is enclosed within a ferrous pipe or tube for the width of the corridor need not comply with Items 1 through 5 . 307.11.6.3 Identification . Piping , tubing and HPM waste lines shall be identified in accordance with ...
... piping which is enclosed within a ferrous pipe or tube for the width of the corridor need not comply with Items 1 through 5 . 307.11.6.3 Identification . Piping , tubing and HPM waste lines shall be identified in accordance with ...
Page 1-186
... pipe . 1906.3.6.3 They have a nominal inside diameter not over 2 inches ( 51 mm ) and are spaced not less than three diameters on centers . 1906.3.7 Pipes and fittings shall be designed to resist effects of the material , pressure and ...
... pipe . 1906.3.6.3 They have a nominal inside diameter not over 2 inches ( 51 mm ) and are spaced not less than three diameters on centers . 1906.3.7 Pipes and fittings shall be designed to resist effects of the material , pressure and ...
Page 1-321
... PIPE INLETS 907.1 General . All basement pipe inlets shall be installed in ac- cordance with the requirements of this section . 907.2 Where Required . Basement pipe inlets shall be installed in the first floor of every store , warehouse ...
... PIPE INLETS 907.1 General . All basement pipe inlets shall be installed in ac- cordance with the requirements of this section . 907.2 Where Required . Basement pipe inlets shall be installed in the first floor of every store , warehouse ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood