Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 7
Page 1-46
... Proscenium Firesafety Curtains 2. UBC Standard 7-1 , Fire Tests of Building Construction and Materials 3. UBC Standard 8-1 , Test Method for Surface - burning Char- acteristics of Building Materials 4. UBC Standard 9-1 , Installation of ...
... Proscenium Firesafety Curtains 2. UBC Standard 7-1 , Fire Tests of Building Construction and Materials 3. UBC Standard 8-1 , Test Method for Surface - burning Char- acteristics of Building Materials 4. UBC Standard 9-1 , Installation of ...
Page 1-47
... proscenium opening where proscenium wall and opening protection is pro- vided . The system shall be activated independently by each of the following : ( 1 ) activation of the sprinkler system in the stage area and ( 2 ) by a manually ...
... proscenium opening where proscenium wall and opening protection is pro- vided . The system shall be activated independently by each of the following : ( 1 ) activation of the sprinkler system in the stage area and ( 2 ) by a manually ...
Page 1-436
... PROSCENIUM Sprinklers required PROSCENIUM CURTAIN , required PROTECTIVE MEMBRANE PUBLIC GARAGE ( see GARAGE , PUBLIC ) 503.2.1 , 705 1204 3202 3205.2 2603.11 2603.13 405.3.4 405.1.1 , 405.3.4 303.8 , 405.3.1 217 Hazardous materials ...
... PROSCENIUM Sprinklers required PROSCENIUM CURTAIN , required PROTECTIVE MEMBRANE PUBLIC GARAGE ( see GARAGE , PUBLIC ) 503.2.1 , 705 1204 3202 3205.2 2603.11 2603.13 405.3.4 405.1.1 , 405.3.4 303.8 , 405.3.1 217 Hazardous materials ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood