Uniform Building Code, Volume 1International Conference of Building Officials, 1997 - Building laws |
From inside the book
Results 1-3 of 91
Page 1-170
... tion investigation . The provisions of this section do not apply to building and foun- dation systems in those areas subject to scour and water pressure by wind and wave action . Buildings and foundations subject to such loads shall be ...
... tion investigation . The provisions of this section do not apply to building and foun- dation systems in those areas subject to scour and water pressure by wind and wave action . Buildings and foundations subject to such loads shall be ...
Page 1-326
... tion is technically infeasible , the alteration shall provide access to the maximum extent technically feasible . EXCEPTION : Alterations to Group R , Division 1 apartment oc- cupancies need not comply with this section . 1112.1.2 ...
... tion is technically infeasible , the alteration shall provide access to the maximum extent technically feasible . EXCEPTION : Alterations to Group R , Division 1 apartment oc- cupancies need not comply with this section . 1112.1.2 ...
Page 1-335
... tion requirements when approved by the building official . SECTION 1515- INSPECTION AND WRITTEN APPROVAL 1515.1 Written Approval Required . New roofing shall not be applied without first obtaining written approval from the building ...
... tion requirements when approved by the building official . SECTION 1515- INSPECTION AND WRITTEN APPROVAL 1515.1 Written Approval Required . New roofing shall not be applied without first obtaining written approval from the building ...
Contents
UBC Standard 21 Noncombustible MaterialTests | 1-7 |
UBC Standard 72 Fire Tests of Door Assemblies | 1-68 |
UBC Standard 2111 | 1-94 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
accessible aggregate aisle applied approved area of refuge ASTM automatic sprinkler system B.W. gage braced wall lines building official building or structure ceiling cement combustible comply concrete conform corridor Division 3 Occupancies doors dwelling units elevator equipment exceed EXCEPTION exit-access exterior walls fire assembly Fire Code fire-resistive construction fire-resistive rating floor area grade Group H grout gypsum hazardous height inches inspection installed insulation joists kN/m² live load located masonry materials maximum means of egress minimum N/C less nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels percent perlite portion reinforcement requirements of Section roof rooms Select Structural sheathing slope smoke smoke detector space specified in Chapter specified in Section square feet stairways standpipes steel storage story studs surface Table tested thickness tion Type UBC Standard Uniform Building Code units vertical veneer ventilation vermiculite vertical in 12 wallboard water closet width wire wood