Engineering Design: A Materials and Processing ApproachThe second edition has been reorganized so that the book starts directly with a consideration of the design process, and then goes on to show how design fits into society, the engineering organization, and technology innovation process. Much greater emphasis is given to ideas for conceptual design. |
From inside the book
Results 1-3 of 6
Page 343
... factory overhead rates of 150 to 200 percent of direct labor . The subject of over- head is discussed more fully in the next section . 9-8 OVERHEAD COSTS Perhaps no aspect of cost evaluation creates more confusion and frustration in the ...
... factory overhead rates of 150 to 200 percent of direct labor . The subject of over- head is discussed more fully in the next section . 9-8 OVERHEAD COSTS Perhaps no aspect of cost evaluation creates more confusion and frustration in the ...
Page 344
... overhead rate = 1,900,000 1,650,000 = ( 100 ) 115 % In the next example of overhead costs , we consider the use of factory overhead in determining the cost of performing a manufacturing operation . Example 9-6 A batch of 100 parts ...
... overhead rate = 1,900,000 1,650,000 = ( 100 ) 115 % In the next example of overhead costs , we consider the use of factory overhead in determining the cost of performing a manufacturing operation . Example 9-6 A batch of 100 parts ...
Page 354
... Factory overhead at 82 percent of item 1 8.70 4349.02 3 Subtotal $ 19.30 $ 9652.71 General & administrative at 20 percent of item 3 3.86 1930.54 5 Material cost and purchased parts 0.45 225.00 6 Overhead on item 5 at 15 % 0.06 33.75 7 ...
... Factory overhead at 82 percent of item 1 8.70 4349.02 3 Subtotal $ 19.30 $ 9652.71 General & administrative at 20 percent of item 3 3.86 1930.54 5 Material cost and purchased parts 0.45 225.00 6 Overhead on item 5 at 15 % 0.06 33.75 7 ...
Contents
The Engineering Enterprise | 1 |
The Design Process | 27 |
Problem Solving and Decision Making | 69 |
Copyright | |
20 other sections not shown
Other editions - View all
Common terms and phrases
alloy analysis applied austenite basic bending cash flow castings complete components considered corrosion cost crack curve decision decision matrix depreciation determine developed distribution elements engineering design equations equipment estimate evaluation example factor factory overhead failure fatigue Figure forging fracture fracture mechanics given Handbook heat important increase investment John Wiley limit linear linear programming load machine martensite material properties materials selection matrix McGraw-Hill Book Company mechanical method normal distribution null hypothesis objective function operation optimization optimum overhead parameters percent performance plastic Powder Metallurgy Prediction interval probability problem reliability residual stress risk sample sheet situation solution specifications standard statistical steel surface Table technical techniques temperature tensile thermal thickness tion tool usually variables Weibull distribution welding Wiley & Sons wire frame models x₁ yield strength York