Page 24
carrier buoys and when a section is completed it is towed out to the pipeline tracé , see Fig . 1. Control and positioning of the long sections is a difficult task when the pipeline is exposed to waves and current action , two methods ...
carrier buoys and when a section is completed it is towed out to the pipeline tracé , see Fig . 1. Control and positioning of the long sections is a difficult task when the pipeline is exposed to waves and current action , two methods ...
Page 63
RE - INSTATEMENT OF PIPELINE AFTER REPAIR - removal of repair tool / materials - check of pipeline integrity - test of pipeline leak tightness - hydrostatic pressure test - dewatering and drying - introduction of fluid for transport .
RE - INSTATEMENT OF PIPELINE AFTER REPAIR - removal of repair tool / materials - check of pipeline integrity - test of pipeline leak tightness - hydrostatic pressure test - dewatering and drying - introduction of fluid for transport .
Page 113
IN - SERVICE MECHANICAL BEHAVIOR OF HEATED PIPELINES LAID ON SEABED SURFACE Y. Friedmann ОТР Pipeline Division Sofresid , France 113 Progressive Rippage of Sediments Pipeline Behavior , from Puech &.
IN - SERVICE MECHANICAL BEHAVIOR OF HEATED PIPELINES LAID ON SEABED SURFACE Y. Friedmann ОТР Pipeline Division Sofresid , France 113 Progressive Rippage of Sediments Pipeline Behavior , from Puech &.
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
PIPELINE DESIGN AND OPERATIONS | 1 |
PIPELINE INDUSTRY OUTLOOK 89 | 69 |
PIPELINE FORCES DYNAMICS AND STABILITY I | 95 |
Copyright | |
13 other sections not shown
Other editions - View all
Common terms and phrases
analysis applied assumed bending bottom buckling bundle calculated caused coefficient Conference considered construction cost crack dependent depth determined developed diameter direction displacement effect Engineering equation experiments factor failure field Figure flow forces function geometry given heat horizontal hydrogen included increase indicated initial installation internal length lift force limit load lower material maximum measured Mechanics metal method monitoring movement natural obtained occur Offshore operation parameters pass pipe pipeline position possible predicted present pressure problem procedure production range ratio reduced REFERENCES reliability repair Research resistance response scour seabed separator shown shows simulation soil solution span steel strength stress structural surface Table temperature term tion tool velocity vertical vibration wave weight welding zone