7 shows a curve where the variation of maximum localized corrosion rate as a function of steel potential is indicated ( Lotsberg et al . 1983 ) . A potential of less than -0.8 V versus a silver / silver chloride / sea water ( Ag / AgCl ...
7 shows a curve where the variation of maximum localized corrosion rate as a function of steel potential is indicated ( Lotsberg et al . 1983 ) . A potential of less than -0.8 V versus a silver / silver chloride / sea water ( Ag / AgCl ...
Page 281
It has been assumed that the corrosion protection system has been inspected the first period after installation , and it has been found that it is mainly working as intended during the design . The largest probability that the corrosion ...
It has been assumed that the corrosion protection system has been inspected the first period after installation , and it has been found that it is mainly working as intended during the design . The largest probability that the corrosion ...
Page 337
SUMMARY OF DESIRED IMPROVEMENTS IN CURRENT ILI TOOLS % of Responses from ILI users from non - ILI users Improvement accurate assessment of the severity of corrosion defects and for the accurate detection and sizing of cracks in ...
SUMMARY OF DESIRED IMPROVEMENTS IN CURRENT ILI TOOLS % of Responses from ILI users from non - ILI users Improvement accurate assessment of the severity of corrosion defects and for the accurate detection and sizing of cracks in ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
OFFSHORE OUTLOOK 1989 | 1 |
Trends in U S Offshore Oil and Gas Development | 11 |
OFFSHORE TECHNOLOGY NONDESTRUCTIVE TESTING | 19 |
Copyright | |
51 other sections not shown
Other editions - View all
Common terms and phrases
addition allow analysis applied approach assumed calculated columns components concept configuration connection considered corrosion cost crack cutting deck detection direction distribution drilling dynamic effects element Engineering equations equipment estimated evaluation experiments failure fatigue field Figure flow force frequency function given important increase industry inspection installation International jacket limit load marine maximum mean measured method mooring motion natural obtained offshore operation parameters performed period pipe pipeline planning platform position possible present pressure probability problem production range reduced relative reliability removal response riser safety Seamill shown shows steel stress structure surface surge Table techniques tension tether thickness transfer ultrasonic unit values water depth wave weight