Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 1; Volume 8, Part 1American Society of Mechanical Engineers, 1989 - Arctic regions |
From inside the book
Results 1-3 of 85
Page 227
In parallel to that there is a need to develop credible methods and technology which will meet the needs of industry and be prepared to meet the demand for platform decommissioning and removal in the 1990's .
In parallel to that there is a need to develop credible methods and technology which will meet the needs of industry and be prepared to meet the demand for platform decommissioning and removal in the 1990's .
Page 255
Blanken , and Arnesen , " Steel Platform Structure Removal A Case Study " , NSF Seminar on Removal of Offshore Installations , Bergen , Norway . O 5 . An acceptable compromise proposal , primarily aimed at safe navigation , has been ...
Blanken , and Arnesen , " Steel Platform Structure Removal A Case Study " , NSF Seminar on Removal of Offshore Installations , Bergen , Norway . O 5 . An acceptable compromise proposal , primarily aimed at safe navigation , has been ...
Page 269
DECOMMISSIONING AND REMOVAL OF OFFSHORE PLATFORMS AND PIPELINES ENGINEERING OPTIONS P. W. Penney University of Newcastle Upon Tyne Newcastle Upon Tyne , United Kingdom 1 A SYSTEMATIC METHOD FOR PLANNING IN - SERVICE INSPECTION.
DECOMMISSIONING AND REMOVAL OF OFFSHORE PLATFORMS AND PIPELINES ENGINEERING OPTIONS P. W. Penney University of Newcastle Upon Tyne Newcastle Upon Tyne , United Kingdom 1 A SYSTEMATIC METHOD FOR PLANNING IN - SERVICE INSPECTION.
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
OFFSHORE OUTLOOK 1989 | 1 |
Trends in U S Offshore Oil and Gas Development | 11 |
OFFSHORE TECHNOLOGY NONDESTRUCTIVE TESTING | 19 |
Copyright | |
51 other sections not shown
Other editions - View all
Common terms and phrases
addition allow analysis applied approach assumed calculated columns components concept configuration connection considered corrosion cost crack cutting deck detection direction distribution drilling dynamic effects element Engineering equations equipment estimated evaluation experiments failure fatigue field Figure flow force frequency function given important increase industry inspection installation International jacket limit load marine maximum mean measured method mooring motion natural obtained offshore operation parameters performed period pipe pipeline planning platform position possible present pressure probability problem production range reduced relative reliability removal response riser safety Seamill shown shows steel stress structure surface surge Table techniques tension tether thickness transfer ultrasonic unit values water depth wave weight