California Building Code, Volume 1International Conference of Building Officials, 1998 - Building laws |
From inside the book
Results 1-3 of 89
Page
... elevator lobby inoffice buildings . 2. Elevator lobbies located within an atrium complying with the pro- visions of Section 402 . 3. In fully sprinklered office buildings , corridors may lead through enclosed elevator lobbies if all ...
... elevator lobby inoffice buildings . 2. Elevator lobbies located within an atrium complying with the pro- visions of Section 402 . 3. In fully sprinklered office buildings , corridors may lead through enclosed elevator lobbies if all ...
Page 1-285
... elevators , dumbwaiters , escalators and moving walks and their hoistways . SECTION 3002 - ENCLOSURES - ELEVATOR AND ELEVATOR LOBBY Walls and partitions enclosing elevator and dumbwaiter hoistway shafts and escalator shafts shall not be ...
... elevators , dumbwaiters , escalators and moving walks and their hoistways . SECTION 3002 - ENCLOSURES - ELEVATOR AND ELEVATOR LOBBY Walls and partitions enclosing elevator and dumbwaiter hoistway shafts and escalator shafts shall not be ...
Page 1-399
... elevator , moving walk , escalator or dumbwaiter , or to make major alterations to any existing elevator , dumbwaiter , escalator or moving walk as defined in Part XII of the ANSI code , without having first obtained a permit for such ...
... elevator , moving walk , escalator or dumbwaiter , or to make major alterations to any existing elevator , dumbwaiter , escalator or moving walk as defined in Part XII of the ANSI code , without having first obtained a permit for such ...
Contents
Matrix Adoption Tables | XTC-3 |
UBC Standard 21 Noncombustible MaterialTests | 1-11 |
UBC Standard 102 Stairway Identification | 1-105 |
Copyright | |
6 other sections not shown
Other editions - View all
Common terms and phrases
1998 CALIFORNIA BUILDING 30 inches accordance applied approved assembly ASTM B.W. gage braced wall lines building official building or structure CALIFORNIA BUILDING CODE ceiling cement Chapter concrete conform corridor curb ramps devices Division 3 Occupancies doors DOSH DSA/AC dwelling units elevator enclosure enforcing agency equipment exceed EXCEPTION exit exterior walls facilities Fire Code fire-resistive rating fixture floor area Group H grout gypsum handrails hazard HCD 1/AC height inches 51 mm installed joists least less located masonry materials maximum means of egress minimum nails noncombustible occupant load openings OSHPD panels percent permitted plaster pool portland cement protected ramp regulations reinforcement requirements of Section roof rooms Select Structural sheathing side slope smoke smoke detector space specified in Section square feet stairways steel storage studs surface Table Test thickness tion toilet Type UBC Standard Uniform Building Code veneer ventilation wallboard water closet wheelchair width wire wood