California Building Code, Volume 1International Conference of Building Officials, 1998 - Building laws |
From inside the book
Results 1-3 of 85
Page 1-145
California. Chapter 15 ROOFING AND ROOF STRUCTURES CALACA CACACAC JLLLLLL. 1502 SECTION 1501 - SCOPE 1501.1 General . Roofing assemblies , roof coverings and roof structures shall be as specified in this code and as otherwise required by ...
California. Chapter 15 ROOFING AND ROOF STRUCTURES CALACA CACACAC JLLLLLL. 1502 SECTION 1501 - SCOPE 1501.1 General . Roofing assemblies , roof coverings and roof structures shall be as specified in this code and as otherwise required by ...
Page 1-146
... roof . ROOFING ASSEMBLY includes the roof deck , substrate or thermal barrier , insulation , vapor retarder , underlayment , inter- layment , base plies , roofing plies , and roof covering that is assigned a roofing classification ...
... roof . ROOFING ASSEMBLY includes the roof deck , substrate or thermal barrier , insulation , vapor retarder , underlayment , inter- layment , base plies , roofing plies , and roof covering that is assigned a roofing classification ...
Page 1-147
... Roofs shall be sloped a minimum of 1 unit ver- tical in 48 units horizontal ( 2 % slope ) for drainage unless designed for water accumulation in accordance with Section 1611 and approved by the building official . 1506.2 Roof Drains ...
... Roofs shall be sloped a minimum of 1 unit ver- tical in 48 units horizontal ( 2 % slope ) for drainage unless designed for water accumulation in accordance with Section 1611 and approved by the building official . 1506.2 Roof Drains ...
Contents
Matrix Adoption Tables | XTC-3 |
UBC Standard 21 Noncombustible MaterialTests | 1-11 |
UBC Standard 102 Stairway Identification | 1-105 |
Copyright | |
6 other sections not shown
Other editions - View all
Common terms and phrases
1998 CALIFORNIA BUILDING 30 inches accordance applied approved assembly ASTM B.W. gage braced wall lines building official building or structure CALIFORNIA BUILDING CODE ceiling cement Chapter concrete conform corridor curb ramps devices Division 3 Occupancies doors DOSH DSA/AC dwelling units elevator enclosure enforcing agency equipment exceed EXCEPTION exit exterior walls facilities Fire Code fire-resistive rating fixture floor area Group H grout gypsum handrails hazard HCD 1/AC height inches 51 mm installed joists least less located masonry materials maximum means of egress minimum nails noncombustible occupant load openings OSHPD panels percent permitted plaster pool portland cement protected ramp regulations reinforcement requirements of Section roof rooms Select Structural sheathing side slope smoke smoke detector space specified in Section square feet stairways steel storage studs surface Table Test thickness tion toilet Type UBC Standard Uniform Building Code veneer ventilation wallboard water closet wheelchair width wire wood