California Building Code, Volume 1International Conference of Building Officials, 1998 - Building laws |
From inside the book
Results 1-3 of 66
Page 1-102
... spacing and venting ratios . The build- ing official [ for DSA / SS , OSHPD 1 ] the enforcement agency may require documentation of the design to ensure proper performance of required venting . Temperature activation of vents shall be ...
... spacing and venting ratios . The build- ing official [ for DSA / SS , OSHPD 1 ] the enforcement agency may require documentation of the design to ensure proper performance of required venting . Temperature activation of vents shall be ...
Page 1-143
... spacing between horizontal sup- ports may be increased when special design techniques , approved by the enforcement ... spacing shall not exceed 16 inches ( 406 mm ) on center and 2 - inch - by - 6 - inch ( 51 mm by 152 mm ) stud spacing ...
... spacing between horizontal sup- ports may be increased when special design techniques , approved by the enforcement ... spacing shall not exceed 16 inches ( 406 mm ) on center and 2 - inch - by - 6 - inch ( 51 mm by 152 mm ) stud spacing ...
Page 1-271
... Spacing of Hangers or Supports ( Along Runners ) x 304.8 for mm 3/4 " 0.3 11/2 ′′ 11/2 " 11/2 ′′ 1/2 " - 2 " 2 ... Spacing of Runners Size and Type of Cross - furring or Supports 1/4 " diameter pencil rods x 25.4 for mm x 1.49 for kg ...
... Spacing of Hangers or Supports ( Along Runners ) x 304.8 for mm 3/4 " 0.3 11/2 ′′ 11/2 " 11/2 ′′ 1/2 " - 2 " 2 ... Spacing of Runners Size and Type of Cross - furring or Supports 1/4 " diameter pencil rods x 25.4 for mm x 1.49 for kg ...
Contents
Matrix Adoption Tables | XTC-3 |
UBC Standard 21 Noncombustible MaterialTests | 1-11 |
UBC Standard 102 Stairway Identification | 1-105 |
Copyright | |
6 other sections not shown
Other editions - View all
Common terms and phrases
1998 CALIFORNIA BUILDING 30 inches accordance applied approved assembly ASTM B.W. gage braced wall lines building official building or structure CALIFORNIA BUILDING CODE ceiling cement Chapter concrete conform corridor curb ramps devices Division 3 Occupancies doors DOSH DSA/AC dwelling units elevator enclosure enforcing agency equipment exceed EXCEPTION exit exterior walls facilities Fire Code fire-resistive rating fixture floor area Group H grout gypsum handrails hazard HCD 1/AC height inches 51 mm installed joists least less located masonry materials maximum means of egress minimum nails noncombustible occupant load openings OSHPD panels percent permitted plaster pool portland cement protected ramp regulations reinforcement requirements of Section roof rooms Select Structural sheathing side slope smoke smoke detector space specified in Section square feet stairways steel storage studs surface Table Test thickness tion toilet Type UBC Standard Uniform Building Code veneer ventilation wallboard water closet wheelchair width wire wood