... period without developing unexposed surface conditions which will ignite cotton waste . 2. Transmission of heat through the specimen during the classification period shall not have been such as to raise the average temperature on its ...
... period without developing unexposed surface conditions which will ignite cotton waste . 2. Transmission of heat through the specimen during the classification period shall not have been such as to raise the average temperature on its ...
Page 3-57
... period is 60 minutes or over , a correction shall be applied for variation of the furnace exposure from that prescribed , where it will affect the rating , by multiplying the indicated period by two thirds of the difference in area ...
... period is 60 minutes or over , a correction shall be applied for variation of the furnace exposure from that prescribed , where it will affect the rating , by multiplying the indicated period by two thirds of the difference in area ...
Page 3-115
... period of clay masonry walls shall be determined in ac- cordance with this section . The fire - resistance periods ... period shall be determined in accordance with Section 7.720.2 . When continuous air spaces separate multiwythe walls ...
... period of clay masonry walls shall be determined in ac- cordance with this section . The fire - resistance periods ... period shall be determined in accordance with Section 7.720.2 . When continuous air spaces separate multiwythe walls ...
Contents
General Building Limitations | 3-1 |
Administrative Fire and LifeSafety and Field Inspection Provisions | 3-3 |
Chapter | 3-9 |
Copyright | |
99 other sections not shown
Other editions - View all
Common terms and phrases
accordance ANSI applied approved assembly ASTM authority having jurisdiction beams braces branch lines brick building official ceiling cement check valve classification combustible concrete masonry construction control valve curtain deck deflectors determined devices diameter dimensions distance door drain dry pipe valve duct edge equipment exceed Exception feet Figure fire department connection fire test fire-resistance rating flange floor flow furnace grade gypsum hangers Hazard Occupancies heat horizontal hydrostatic test installed joints joist klers knots length less limited liquid limit listed load located material maximum minimum mortar nails NFPA noncombustible Obstruction opening operation percent permitted pipe system portland cement preaction pressure protection riser roof Screw SECTION side spaced specified sprinkler system sq ft standpipe system storage structural steel structural steel columns Table temperature test sample thermocouples tion tube Type U.B.C. Standard Uniform Building Code units vertical water supply weight welding width wood