Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volumes 5-6American Society of Mechanical Engineers, 1989 - Arctic regions |
From inside the book
Results 1-3 of 84
Page 6
... ROUTE WATER OMAE - 89-851 FIGURE - 2 BOTTOM ( A ) BOTTOM ( B ) BOTTOM ( C ) 20 KNOT WINDS FROM N.E. HOLDBACK mo PIPE WAVE PIPE WAVE PIPE WAVE NORTH DISTANCE FROM SHORE IN 1000'S OF FEET We BOTTOM ( D ) BOTTOM ( E ) FIGURE - 4 BOTTOM ...
... ROUTE WATER OMAE - 89-851 FIGURE - 2 BOTTOM ( A ) BOTTOM ( B ) BOTTOM ( C ) 20 KNOT WINDS FROM N.E. HOLDBACK mo PIPE WAVE PIPE WAVE PIPE WAVE NORTH DISTANCE FROM SHORE IN 1000'S OF FEET We BOTTOM ( D ) BOTTOM ( E ) FIGURE - 4 BOTTOM ...
Page 23
Off - bottom tow where floaters and chain ends are connected to the pipeline . The total buoyancy of the system is determined so that the pipeline floats above the sea bottom with a part of the chain lying on the sea bottom .
Off - bottom tow where floaters and chain ends are connected to the pipeline . The total buoyancy of the system is determined so that the pipeline floats above the sea bottom with a part of the chain lying on the sea bottom .
Page 72
Bottom or near bottom operating systems must be able to recognize existing , bottom features or be able to chart new ones during a transit / survey mission . A pre - planted and surveyed bottom transponder grid or path could also be ...
Bottom or near bottom operating systems must be able to recognize existing , bottom features or be able to chart new ones during a transit / survey mission . A pre - planted and surveyed bottom transponder grid or path could also be ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
PIPELINE DESIGN AND OPERATIONS | 1 |
PIPELINE INDUSTRY OUTLOOK 89 | 69 |
PIPELINE FORCES DYNAMICS AND STABILITY I | 95 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
analysis applied assumed bending bottom buckling bundle calculated caused coefficient Conference considered construction cost crack dependent depth determined developed diameter direction displacement effect Engineering equation experiments factor failure field Figure flow force function geometry given heat horizontal hydrogen included increase indicated initial installation internal length lift force limit load lower material maximum measured Mechanics metal method monitoring movement natural obtained occur Offshore operation parameters pass pipe pipeline position possible predicted present pressure problem procedure production ratio reduced REFERENCES reliability repair Research resistance response scour seabed separator shown shows simulation soil solution span steel strength stress structural surface Table temperature term tion tool velocity vertical vibration wave weight welding zone