... ANCHOR STUDIES Preliminary studies were conducted which compared various anchoring systems for the F.P.P. These included driven piles , jetted piles and drag embedment anchors . A jetted anchor pile design was developed to an advanced ...
... ANCHOR STUDIES Preliminary studies were conducted which compared various anchoring systems for the F.P.P. These included driven piles , jetted piles and drag embedment anchors . A jetted anchor pile design was developed to an advanced ...
Page 5
... anchors , chains and mooring wire . This machinery comprised the following items : o Special large anchor handling winch with chain wildcats , and independently operated double drum reels for handling the installation wires required for ...
... anchors , chains and mooring wire . This machinery comprised the following items : o Special large anchor handling winch with chain wildcats , and independently operated double drum reels for handling the installation wires required for ...
Page 5
-1500 POSITION OF ANCHOR ASSUMING 200 FT DRAG DISTANCE FROM SET DOWN POSITION WITH 210 KIPS PRETENSION ANCHOR RIBITION T - COOR ( PT ) 1 2,441 , 640 9 10,147,358 1 2 2,441 , 760 2 10 , 152 , 296 3 3 2,445,4036 10 , 55 , 892 9 4 ...
-1500 POSITION OF ANCHOR ASSUMING 200 FT DRAG DISTANCE FROM SET DOWN POSITION WITH 210 KIPS PRETENSION ANCHOR RIBITION T - COOR ( PT ) 1 2,441 , 640 9 10,147,358 1 2 2,441 , 760 2 10 , 152 , 296 3 3 2,445,4036 10 , 55 , 892 9 4 ...
Contents
FLOATING PRODUCTION SYSTEMS | 1 |
OFFSHORE MECHANICS | 23 |
Early Production Systems in the North | 31 |
Copyright | |
35 other sections not shown
Other editions - View all
Common terms and phrases
analysis anchor applied bending calculations components Conference connected considerable considered construction cost curve damage depth determined direction displacement distribution drilling dynamic effect element energy Engineering equation equipment excitation fatigue field Figure fixed flexible floating flow forces frequency function geometry included increase inspection installation International joint length limit linear load lower mass matrix maximum mean measured Mechanics method mode model tests mooring mooring system motion obtained Offshore operating parameters performance period phase pile pipe pipeline platform position presented pressure production ratio response riser RPIT shear shown shows significant soil static stiffness strength stress structure surface Table technique Technology tension tool tower turbine vessel wave weight