... installation of the mooring legs . One leg was deployed at a time with the primary installation vessel returning to the Base Port to load - out mooring components for each subsequent installation . One vessel , the Damon Chouest ...
... installation of the mooring legs . One leg was deployed at a time with the primary installation vessel returning to the Base Port to load - out mooring components for each subsequent installation . One vessel , the Damon Chouest ...
Page 526
... installation depths , winds , waves , and currents not generally encountered in commercial submarine power cable projects . The two major technical areas of the Hawaii Deep Water Cable program are related to cable design and installation ...
... installation depths , winds , waves , and currents not generally encountered in commercial submarine power cable projects . The two major technical areas of the Hawaii Deep Water Cable program are related to cable design and installation ...
Page 526
... installation depths , winds , waves , and currents not generally encountered in commercial submarine power cable projects . The two major technical areas of the Hawaii Deep Water Cable program are related to cable design and installation ...
... installation depths , winds , waves , and currents not generally encountered in commercial submarine power cable projects . The two major technical areas of the Hawaii Deep Water Cable program are related to cable design and installation ...
Contents
FLOATING PRODUCTION SYSTEMS | 1 |
OFFSHORE MECHANICS | 23 |
Early Production Systems in the North | 31 |
Copyright | |
35 other sections not shown
Other editions - View all
Common terms and phrases
analysis anchor applied bending calculations components Conference connected considerable considered construction cost curve damage depth determined direction displacement distribution drilling dynamic effect element energy Engineering equation equipment excitation fatigue field Figure fixed flexible floating flow forces frequency function geometry included increase inspection installation International joint length limit linear load lower mass matrix maximum mean measured Mechanics method mode model tests mooring mooring system motion obtained Offshore operating parameters performance period phase pile pipe pipeline platform position presented pressure production ratio response riser RPIT shear shown shows significant soil static stiffness strength stress structure surface Table technique Technology tension tool tower turbine vessel wave weight