Uniform Building Code |
From inside the book
Results 1-3 of 65
Page 148
... equipment or machinery 5. Suspended ceiling framing systems ( applies to Seismic Zones Nos . 2 , 3 and 4 only ) -see ... equipment and machinery , the appropriate values of C shall be determined with consideration given to both the ...
... equipment or machinery 5. Suspended ceiling framing systems ( applies to Seismic Zones Nos . 2 , 3 and 4 only ) -see ... equipment and machinery , the appropriate values of C shall be determined with consideration given to both the ...
Page 557
... equipment . The activation of the ventilating equipment shall be initiated by a smoke detector installed outside the vestibule door in an approved location . The activation of the closing device on any door shall activate the closing ...
... equipment . The activation of the ventilating equipment shall be initiated by a smoke detector installed outside the vestibule door in an approved location . The activation of the closing device on any door shall activate the closing ...
Page 592
... equipment . The exhaust capacity shall be 200 cubic feet per minute for each lamp connected to the lamp exhaust system , or as recommended by the equipment manufacturer . Auxiliary air may be introduced into the system through a ...
... equipment . The exhaust capacity shall be 200 cubic feet per minute for each lamp connected to the lamp exhaust system , or as recommended by the equipment manufacturer . Auxiliary air may be introduced into the system through a ...
Contents
008228 | 19 |
Part Administrative | 25 |
Permits and Inspections | 31 |
Copyright | |
108 other sections not shown
Other editions - View all
Common terms and phrases
accordance with Section applied approved bars beam bending bolts building official building or structure ceiling Chapter column compression members computed concrete dead load Decking diameter distance Division 1 Occupancies doors exceed exit exterior walls extreme fiber factor fire-resistive construction fire-resistive rating flange Formula framing gauge girders grade grain Group grout gypsum gypsum plaster height horizontal installed joints joists laminations length less live load located masonry materials maximum minimum modulus of elasticity nails noncombustible occupancy separation occupant load one-hour fire-resistive openings panels permitted perpendicular plastic plywood portland cement pounds per square prestressing protected ratio resist roof rooms Select Structural shear reinforcement shear strength shear stress sheathing side slab smoke detector space span specified in Section splices square feet square inch stairway steel studs surface Table tensile stress tension tests thickness Type U.B.C. Standard units at least values vertical welds width wire wood yield strength