... installation analyses , were subjected to independent third party verifications . Risk Evaluations . All critical installation and construction operations were subjected to a risk evaluations prior to commencement . This was executed ...
... installation analyses , were subjected to independent third party verifications . Risk Evaluations . All critical installation and construction operations were subjected to a risk evaluations prior to commencement . This was executed ...
Page 18
... INSTALLATION Installation engineering for the nearshore area included both static and dynamic pipelay analyses to establish laybarge parameters and installation procedures for pipeline installation . Installation Procedures Owing to the ...
... INSTALLATION Installation engineering for the nearshore area included both static and dynamic pipelay analyses to establish laybarge parameters and installation procedures for pipeline installation . Installation Procedures Owing to the ...
Page 245
... installation and to train our construction crews . The initial installation went about as expected , taking one full 10 - hour day to hook up . The second installation , which took about six ( 6 ) hours total , indicated that the crew ...
... installation and to train our construction crews . The initial installation went about as expected , taking one full 10 - hour day to hook up . The second installation , which took about six ( 6 ) hours total , indicated that the crew ...
Contents
TROLL PIPELINE PROJECT | 1 |
SAFETY | 3 |
VOLUME IB OFFSHORE TECHNOLOGY | 4 |
Copyright | |
14 other sections not shown
Other editions - View all
Common terms and phrases
analysis applied Arctic Engineering ASME assessment axial bending borehole buckling buckling length calculated Castorano configuration construction corrosion curve defects Det Norske Veritas diameter displacement dynamic effect factor failure Fensfjorden Figure fjord flexible pipe flow free span friction GTAW hoop stress horizontal impact installation interaction intervention J-lay Kollsnes landfall lateral counteracts laybarge laying length limit load martensitic material maximum Mechanics and Arctic meter Mongstad movement Norske Shell Norwegian Norwegian Trench Offshore Mechanics offshore pipelines operation parameters performed pipe material pipelay pipeline route Pipeline Technology post-lay pre-lay prebent section pressure pull-in riser rock safety seabed seismic shear strength slope soil spool stability Statoil steel stinger strain strength subsea survey temperature tension trawl board trench Troll Oil Pipeline Troll Phase tunnel vertical vessel wall thickness water depth weight welding yield strength Zeepipe