Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 41
Page 62
Figure 1 : The Subsea Boosting Module at the Integration Yard MEASUREMENTS POINTS PRESSURE TRANSFER VESSELS .A .1.6 . 9. 10 • 11.10 POSMON SWITCHES UNEM DISPACEMENT OFFERENTWL PRESSURE • 17.20 • 21-23 • 24 25 TEMPERATURE PRESSURE GAS ...
Figure 1 : The Subsea Boosting Module at the Integration Yard MEASUREMENTS POINTS PRESSURE TRANSFER VESSELS .A .1.6 . 9. 10 • 11.10 POSMON SWITCHES UNEM DISPACEMENT OFFERENTWL PRESSURE • 17.20 • 21-23 • 24 25 TEMPERATURE PRESSURE GAS ...
Page 66
Figure 1 ( Ref . 3 ) gives estimates and known figures of water depth and weight of ( future ) subsea structures . The figures are indicative ; changing technology can influence the weight . It is however clear that any cost effective ...
Figure 1 ( Ref . 3 ) gives estimates and known figures of water depth and weight of ( future ) subsea structures . The figures are indicative ; changing technology can influence the weight . It is however clear that any cost effective ...
Page 71
o 11 = == O = = 11 Il " اخت MULTIPHASE PRODUCTION SYSTEMS R & D STATE OF. TOP VIEW PLAN AT BOTTOM ELEVATION Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 TE Figure 13 Figure 14 * 71.
o 11 = == O = = 11 Il " اخت MULTIPHASE PRODUCTION SYSTEMS R & D STATE OF. TOP VIEW PLAN AT BOTTOM ELEVATION Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 TE Figure 13 Figure 14 * 71.
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch