Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 22
Page 2
The CRS is controlled by the WOCS and they operate together in Sonsub also discussed the various types of riser designs , e.g. two basic modes : the Tree Mode and the Tubing Hanger integral vs. non - integral , jacketed vs. non ...
The CRS is controlled by the WOCS and they operate together in Sonsub also discussed the various types of riser designs , e.g. two basic modes : the Tree Mode and the Tubing Hanger integral vs. non - integral , jacketed vs. non ...
Page 2
The CRS is controlled by the WOCS and they operate together in Sonsub also discussed the various types of riser designs , e.g. two basic modes : the Tree Mode and the Tubing Hanger Mode . integral vs. non - integral , jacketed vs. non ...
The CRS is controlled by the WOCS and they operate together in Sonsub also discussed the various types of riser designs , e.g. two basic modes : the Tree Mode and the Tubing Hanger Mode . integral vs. non - integral , jacketed vs. non ...
Page 10
The MUX system in the Tree Mode will require a new electrical cable / reel and a new 7 - line hydraulic umbilical / reel , both 6,000 ' vin length , and a larger Uninterruptible Power Supply ( UPS ) . Final design of the subsea ...
The MUX system in the Tree Mode will require a new electrical cable / reel and a new 7 - line hydraulic umbilical / reel , both 6,000 ' vin length , and a larger Uninterruptible Power Supply ( UPS ) . Final design of the subsea ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch