Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 14
Page 2
... Popeye Project. BACKGROUND As subsea projects move into deeper water , it is becoming increasingly more difficult for operators to justify the purchase of a Completion / Workover ( C / WO ) Riser and Control System which must be written ...
... Popeye Project. BACKGROUND As subsea projects move into deeper water , it is becoming increasingly more difficult for operators to justify the purchase of a Completion / Workover ( C / WO ) Riser and Control System which must be written ...
Page 9
... Popeye wells , two remote ESD stations were set up , one on the rig floor console and one at the Schlumberger choke manifold on the main pipe deck . The external input signal option was utilized by connecting Schlumberger's shutdown ...
... Popeye wells , two remote ESD stations were set up , one on the rig floor console and one at the Schlumberger choke manifold on the main pipe deck . The external input signal option was utilized by connecting Schlumberger's shutdown ...
Page 10
... Popeye and Mars was also underway at the time of this paper . Additional CRS Equipment . Obviously , it was necessary to increase the number of riser joints for the water depth . The existing riser joints and couplings were already ...
... Popeye and Mars was also underway at the time of this paper . Additional CRS Equipment . Obviously , it was necessary to increase the number of riser joints for the water depth . The existing riser joints and couplings were already ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS