Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 23
Page 18
Suitable control fluids have still to be developed for high temperature application ; Functional Specifications ... have to meet requirements of performance higher than in routine applications ; Requirements of availability of High ...
Suitable control fluids have still to be developed for high temperature application ; Functional Specifications ... have to meet requirements of performance higher than in routine applications ; Requirements of availability of High ...
Page 23
The system is Most of the anticipated development applications call for based around a Master Vehicle that provides hydraulic power either a high level of complexity in case of multiwell systems to , and controls a set of dedicated work ...
The system is Most of the anticipated development applications call for based around a Master Vehicle that provides hydraulic power either a high level of complexity in case of multiwell systems to , and controls a set of dedicated work ...
Page 75
The applications for ... at this time , as the primary market for applications , The potential severity of problems caused by hydrates means that users need confidence that low dosage additives will work before deployment in the field ...
The applications for ... at this time , as the primary market for applications , The potential severity of problems caused by hydrates means that users need confidence that low dosage additives will work before deployment in the field ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch