Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 6
Page 4
... ball valves ( two 2 " valves in the annulus bore and one 4 " valve in the production bore ) with wireline / coiled tubing cutting capability are located below the bore selector . They can be used to isolate the bores , allow circulation ...
... ball valves ( two 2 " valves in the annulus bore and one 4 " valve in the production bore ) with wireline / coiled tubing cutting capability are located below the bore selector . They can be used to isolate the bores , allow circulation ...
Page 5
... ball valves failed to pass the functional verification testing prior to mating the Spanner Joint to the tubing hanger . The ball valve actuators were not operating properly . An investigation proved that the actuators had been damaged ...
... ball valves failed to pass the functional verification testing prior to mating the Spanner Joint to the tubing hanger . The ball valve actuators were not operating properly . An investigation proved that the actuators had been damaged ...
Page 9
... ball valves in the Spanner Joint at Popeye progressed , it became evident that there was a design problem with the actuators in the ball valves . The Mars schedule did not permit time to solve the problems and the BOP Spanner Joint was ...
... ball valves in the Spanner Joint at Popeye progressed , it became evident that there was a design problem with the actuators in the ball valves . The Mars schedule did not permit time to solve the problems and the BOP Spanner Joint was ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS