Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 18
Page 25
The system installation was carried out in two different periods ( December 94 - January 95 and May - July 95 ) , in order to optimise the Agip drilling campaign of two different wells and the availability of a lay vessel from the North ...
The system installation was carried out in two different periods ( December 94 - January 95 and May - July 95 ) , in order to optimise the Agip drilling campaign of two different wells and the availability of a lay vessel from the North ...
Page 81
It is noted that these tracking operations are carried out under many kinds of environmental disturbances , either on the sea surface or under water . To collect accurate information about the disturbance before operation is very ...
It is noted that these tracking operations are carried out under many kinds of environmental disturbances , either on the sea surface or under water . To collect accurate information about the disturbance before operation is very ...
Page 82
On the other hand , the feedforward force is composed , and in the final stage tracking will be carried out only by the feedforward controller . Thruster Thruster • Transmitter Fig . 2 Transmitter & Thruster Arrangement .
On the other hand , the feedforward force is composed , and in the final stage tracking will be carried out only by the feedforward controller . Thruster Thruster • Transmitter Fig . 2 Transmitter & Thruster Arrangement .
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch