Page 24
It also assists the umbilical connection to the CS . X - mas Tree Installation Module ( XTIM ) to install and retrieve the XT and to perform workover operations . The MV and the XT are connected to the surface by a completion riser ...
It also assists the umbilical connection to the CS . X - mas Tree Installation Module ( XTIM ) to install and retrieve the XT and to perform workover operations . The MV and the XT are connected to the surface by a completion riser ...
Page 26
The XT was installed using the XTIM and the MV connected to the Completion Riser , the activity was completed on 01.07.95 ... In the mean time , the connection between the CP and the UTU was performed by means of a work class ROV .
The XT was installed using the XTIM and the MV connected to the Completion Riser , the activity was completed on 01.07.95 ... In the mean time , the connection between the CP and the UTU was performed by means of a work class ROV .
Page 107
The disadvantage of a horizontal connection is that it requires an external force to make up for misalignments and stroke in the connector . The connector has to be landed away from the hub and then be stroked in to swallow the hub ...
The disadvantage of a horizontal connection is that it requires an external force to make up for misalignments and stroke in the connector . The connector has to be landed away from the hub and then be stroked in to swallow the hub ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch