Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 15
Page 92
( xiii ) The DFCS continues to pull the flowline up to the subsea tree or manifold until the flowline hub is 400mm from the connector . ( ii ) The ROV retrieves the torque tool from the deployment frame and installs it onto the drive ...
( xiii ) The DFCS continues to pull the flowline up to the subsea tree or manifold until the flowline hub is 400mm from the connector . ( ii ) The ROV retrieves the torque tool from the deployment frame and installs it onto the drive ...
Page 94
Sonsub achieve this rotational alignment by allowing the connector on the umbilical end to swivel . The hoses and / or wires are separated such that the connector is free to swivel without having to twist the umbilical .
Sonsub achieve this rotational alignment by allowing the connector on the umbilical end to swivel . The hoses and / or wires are separated such that the connector is free to swivel without having to twist the umbilical .
Page 108
Connector capabilities . A number of commercially available mechanically or hydraulically actuated connectors can be used for the end connections . The female half of the connector is welded to the spool at either end while the male ...
Connector capabilities . A number of commercially available mechanically or hydraulically actuated connectors can be used for the end connections . The female half of the connector is welded to the spool at either end while the male ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch